Environmental Impacts
As well as providing a location where wave devices can be demonstrated over several years, Wave Hub has been established with extensive baseline data to enable any environmental impacts of different devices to be determined accurately.
Below there are links leading to the various studies that made up the Environmental Statement that supported Wave Hub’s original consent application.
The scope of ongoing environmental monitoring will be determined in collaboration with the Marine Management Organisations through individual customers’ FEPA licence applications.
Environmental Statement
- Environmental Statement – June 2006
- Interpretation of Geotechnical and Geophysical Conditions
- Interpretation of Geotechnical and Geophysical Conditions-Jan 07
- Non-technical Summary – June 2006
- Report on Terrestrial Ground Investigations
- Wave Energy Converters Mooring Study
- Wave Hub Final Design Report
Appendices
- Appendix A – Coastal Processes
- Appendix B – Sample Analysis
- Appendix C – Habitat Survey
- Appendix D – Intertidal Bird Surveys
- Appendix E – Offshore Bird Surveys
- Appendix F – Intertidal Study
- Appendix G – Environmental Baseline Survey Vol one
- Appendix H – Environmental Baseline Survey Vol two
- Appendix I – Subtidal Benthic Survey
- Appendix J – Commercial Fisheries Study
- Appendix K – Baseline Fisheries Survey
- Appendix L – Navigation Risk Assessment
- Appendix M – Landscape and Visual Assessment Part A
- Appendix M – Landscape and Visual Assessment Part B
- Appendix M – Landscape and Visual Assessment Part C
- Appendix N – Archaeological Assessment
Drawings
- Environment Statement Drawings
- Export cable corridor development boundary
- Indicative trenchless cable duct under dunes long section
- Offshore deployment area and equipment (indicative)
- Offshore deployment area development boundary
- Offshore deployment area with WEC deployment (indicative)
- Onshore compound and substation building (indicative)
- Onshore development boundary location plan
- Onshore development boundary
- Overall development boundary
- Overall scheme proposal
There have been a number of subsequent updates to the baseline information which can be accessed below.