The project to install subsea cable tail extensions across the Wave Hub site was completed during the summer of 2016 and was part-funded by the European Regional Development Fund.

The project comprised work to install four subsea cable extensions at the Wave Hub offshore site and connect them to the existing Wave Hub subsea infrastructure.

This infrastructure enhancement provides four project grid connection points staggered up the west side of the Wave Hub offshore site enabling the deployment of, and electricity generation from, pre-commercial marine renewable technologies.

The equipment installed offers grid-connected projects near berth, robust, flexible and efficient electrical interface arrangements.

Wave Hub Test Site Icon

Wave Hub Test Site

Our grid connected test site for renewable energy technologies with a 48MW capacity located off the north coast of Cornwall.

Read more
Deploying at Wave Hub Icon

Deploying at Wave Hub

Our team of specialists can assist with all aspects of your deployment, from marine operations to electrical systems and consenting and navigational safety.

Read more
Supporting Developers Icon

Supporting Developers

Our region is committed to fostering a strong marine energy industry and there is a range of support available to assist and guide offshore renewable technology developers.

Read more